IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

259

matching recommendations
Reset
SIC 3432 Plumbing Fixture Fittings And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0067 # 02 Y:1986 02 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $125 $150 Not Implemented
MA0067 # 03 Y:1986 03 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $484 $900 Implemented
MA0067 # 04 Y:1986 04 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,076 $7,000 Not Implemented
MA0067 # 05 Y:1986 05 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,611 $4,710 Not Implemented
TS0031 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $18,150 $13,550 Not Implemented
TS0031 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,504 $3,500 Not Implemented
TS0031 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,147 $50 Not Implemented
TS0031 # 04 Y:1985 04 1985 REDUCE GLAZED AREAS IN BUILDINGS $1,681 $1,360 Not Implemented
TS0031 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,076 $280 Not Implemented
TS0031 # 06 Y:1985 06 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,081 $500 Not Implemented
UD0178 # 01 Y:1985 01 1985 COVER OPEN TANKS $2,265 $740 Not Implemented
UD0178 # 02 Y:1985 02 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,261 $3,000 Not Implemented
UD0178 # 03 Y:1985 03 1985 LOWER CEILING TO REDUCE CONDITIONED SPACE $414 $1,250 Not Implemented
UD0178 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,380 $100 Not Implemented
UD0178 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $225 Not Implemented
UD0178 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $114 $150 Implemented
KU0143 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,486 $0 Implemented
KU0143 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,840 $0 Implemented
KU0143 # 03 Y:1984 03 1984 IMPROVE LUBRICATION PRACTICES $3,966 $0 Not Implemented
KU0143 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,586 $3,000 Implemented
KU0143 # 05 Y:1984 05 1984 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,141 $2,000 Implemented
KU0143 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $650 Not Implemented
KU0143 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,043 $1,200 Not Implemented
KU0143 # 08 Y:1984 08 1984 INSULATE BARE EQUIPMENT $755 $500 Not Implemented
KU0143 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $663 $1,200 Not Implemented