Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsSIC | 3432 | Plumbing Fixture Fittings And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0039 # 05 Y:1988 | 05 | 1988 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,235 | $1,040 | Not Implemented |
RU0039 # 06 Y:1988 | 06 | 1988 | INSULATE BARE EQUIPMENT | $248 | $501 | Not Implemented |
RU0039 # 07 Y:1988 | 07 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,785 | $1,260 | Implemented |
RU0039 # 08 Y:1988 | 08 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $116 | $0 | Implemented |
RU0039 # 09 Y:1988 | 09 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $765 | $0 | Implemented |
WI0008 # 01 Y:1987 | 01 | 1987 | IMPROVE LUBRICATION PRACTICES | $562 | $0 | Not Implemented |
WI0008 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $269 | $0 | Implemented |
WI0008 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $644 | $701 | Implemented |
WI0008 # 04 Y:1987 | 04 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $122 | $0 | Implemented |
WI0008 # 05 Y:1987 | 05 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,563 | $5,000 | Not Implemented |
WI0008 # 07 Y:1987 | 07 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $695 | $500 | Implemented |
MA0067 # 01 Y:1986 | 01 | 1986 | AIR CONDITION ONLY SPACE NECESSARY | $262 | $0 | Implemented |
MA0067 # 02 Y:1986 | 02 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $125 | $150 | Not Implemented |
MA0067 # 03 Y:1986 | 03 | 1986 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $484 | $900 | Implemented |
MA0067 # 04 Y:1986 | 04 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,076 | $7,000 | Not Implemented |
MA0067 # 05 Y:1986 | 05 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,611 | $4,710 | Not Implemented |
TS0031 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $18,150 | $13,550 | Not Implemented |
TS0031 # 02 Y:1985 | 02 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,504 | $3,500 | Not Implemented |
TS0031 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,147 | $50 | Not Implemented |
TS0031 # 04 Y:1985 | 04 | 1985 | REDUCE GLAZED AREAS IN BUILDINGS | $1,681 | $1,360 | Not Implemented |
TS0031 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,076 | $280 | Not Implemented |
TS0031 # 06 Y:1985 | 06 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,081 | $500 | Not Implemented |
UD0178 # 01 Y:1985 | 01 | 1985 | COVER OPEN TANKS | $2,265 | $740 | Not Implemented |
UD0178 # 02 Y:1985 | 02 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,261 | $3,000 | Not Implemented |
UD0178 # 03 Y:1985 | 03 | 1985 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $414 | $1,250 | Not Implemented |