Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3432 | Plumbing Fixture Fittings And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0145 # 08 Y:2019 | 08 | 2019 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,134 | $0 | Not Implemented |
WM0145 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,002 | $3,768 | Implemented |
WM0145 # 06 Y:2019 | 06 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,032 | $771 | Not Implemented |
WM0145 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,800 | $1,040 | Not Implemented |
WM0145 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,925 | $2,210 | Not Implemented |
WM0145 # 03 Y:2019 | 03 | 2019 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,173 | $2,200 | Not Implemented |
WM0145 # 02 Y:2019 | 02 | 2019 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $10,866 | $8,300 | Not Implemented |
WM0145 # 01 Y:2019 | 01 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $29,234 | $3,500 | Not Implemented |
WI0322 # 06 Y:1998 | 06 | 1998 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,817 | $0 | Not Implemented |
WI0322 # 09 Y:1998 | 09 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $343 | $740 | Not Implemented |
WI0322 # 08 Y:1998 | 08 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $2,376 | $0 | Not Implemented |
WI0322 # 07 Y:1998 | 07 | 1998 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,087 | $600 | Not Implemented |
WI0322 # 05 Y:1998 | 05 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,677 | $9,000 | Not Implemented |
WI0322 # 04 Y:1998 | 04 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,205 | $4,500 | Not Implemented |
WI0322 # 03 Y:1998 | 03 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $6,348 | $1,000 | Not Implemented |
WI0322 # 02 Y:1998 | 02 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $11,052 | $500 | Not Implemented |
WI0322 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $21,516 | $1,000 | Not Implemented |
WI0008 # 01 Y:1987 | 01 | 1987 | IMPROVE LUBRICATION PRACTICES | $562 | $0 | Not Implemented |
WI0008 # 07 Y:1987 | 07 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $695 | $500 | Implemented |
WI0008 # 05 Y:1987 | 05 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,563 | $5,000 | Not Implemented |
WI0008 # 04 Y:1987 | 04 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $122 | $0 | Implemented |
WI0008 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $644 | $701 | Implemented |
WI0008 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $269 | $0 | Implemented |