IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0426 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,435 $12,000 Implemented
LE0426 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,579 $13,747 Implemented
LE0426 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $780 Implemented
LE0426 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,562 $2,000 Implemented
LE0426 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,840 $1,000 Implemented
LE0426 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $780 Implemented
LE0220 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,586 $500 Implemented
LE0220 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $594 $450 Implemented
LE0220 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $377 $80 Implemented
LE0220 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $25,315 Implemented
HO0186 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $268 $0 Implemented
HO0186 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,988 $0 Implemented
HO0186 # 04 Y:1998 04 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,873 $3,000 Implemented
HO0186 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $11,162 $5,000 Implemented
HO0186 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,900 $1,000 Implemented
HO0138 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,943 $800 Implemented
HO0138 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $562 $1,215 Implemented
HO0138 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,476 $48,874 Implemented
HO0083 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,600 Implemented
HO0083 # 06 Y:1994 06 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,568 $600 Implemented
HO0083 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,879 $3,712 Implemented
RU0110 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,640 $5,700 Implemented
RU0110 # 02 Y:1991 02 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,910 $1,133 Implemented
RU0110 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $527 $0 Implemented
RU0110 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,407 $0 Implemented