Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
152
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0091 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,795 | $1,501 | Not Implemented |
WM0091 # 01 Y:2016 | 01 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $12,568 | $2,860 | Not Implemented |
WM0091 # 07 Y:2016 | 07 | 2016 | USE PHOTOCELL CONTROLS | $1,383 | $560 | Not Implemented |
WM0091 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,051 | $230 | Implemented |
WM0091 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $2,746 | $1,275 | Not Implemented |
WM0091 # 02 Y:2016 | 02 | 2016 | COMBINE UTILITY METERS | $8,777 | $30,000 | Not Implemented |
WM0091 # 04 Y:2016 | 04 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,722 | $0 | Not Implemented |
IA0552 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $4,046 | $2,600 | Implemented |
IA0552 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $886 | $357 | Implemented |
IA0552 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,487 | $35 | Not Implemented |
IA0552 # 06 Y:2016 | 06 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,216 | $390 | Implemented |
IA0552 # 05 Y:2016 | 05 | 2016 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $2,612 | $280 | Not Implemented |
IA0552 # 04 Y:2016 | 04 | 2016 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,573 | $1 | Implemented |
IA0552 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,488 | $35 | Not Implemented |
IA0552 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,982 | $104,231 | Implemented |
WM0061 # 09 Y:2015 | 09 | 2015 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $1,996 | $4,600 | Not Implemented |
WM0061 # 11 Y:2015 | 11 | 2015 | AUTOMATE FINISHING PROCESS | $294,525 | $175,000 | Not Implemented |
WM0061 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,308 | $23,529 | Not Implemented |
WM0061 # 10 Y:2015 | 10 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $658 | $750 | Not Implemented |
WM0061 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $6,292 | $3,164 | Not Implemented |
WM0061 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,854 | $51,600 | Not Implemented |
WM0061 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $400 | $518 | Not Implemented |
WM0061 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,688 | $5,526 | Implemented |
WM0061 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,426 | $1,849 | Implemented |
WM0061 # 07 Y:2015 | 07 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $721 | $2,000 | Not Implemented |