Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
291
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0224 # 04 Y:1987 | 04 | 1987 | REDUCE GLAZED AREAS IN BUILDINGS | $3,429 | $5,800 | Not Implemented |
UD0224 # 05 Y:1987 | 05 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,313 | $2,500 | Implemented |
UD0188 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,133 | $13,400 | Implemented |
UD0188 # 02 Y:1986 | 02 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,279 | $0 | Not Implemented |
UD0182 # 01 Y:1985 | 01 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $153,020 | $24,416 | Implemented |
UD0182 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,436 | $0 | Implemented |
UD0182 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $8,435 | $1,100 | Implemented |
UD0182 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,277 | $50,700 | Not Implemented |
UD0182 # 05 Y:1985 | 05 | 1985 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $2,860 | $1,300 | Not Implemented |
UD0182 # 06 Y:1985 | 06 | 1985 | MINIMIZE WATER USAGE | $38,577 | $4,000 | Implemented |
UD0182 # 07 Y:1985 | 07 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,516 | $2,500 | Implemented |
UD0175 # 01 Y:1985 | 01 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $25,286 | $48,000 | Implemented |
UD0172 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,203 | $150 | Implemented |
UD0172 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,225 | $50 | Implemented |
UD0172 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,195 | $123 | Implemented |
UD0172 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $546 | $0 | Implemented |
UD0158 # 01 Y:1985 | 01 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,705 | $1,260 | Implemented |
UD0158 # 02 Y:1985 | 02 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $434 | $280 | Implemented |
UD0158 # 03 Y:1985 | 03 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,850 | $18,000 | Not Implemented |
UD0158 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $240 | Implemented |
UD0117 # 01 Y:1984 | 01 | 1984 | REDESIGN PROCESS | $9,920 | $18,000 | Not Implemented |
UD0117 # 02 Y:1984 | 02 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,837 | $2,000 | Not Implemented |
UD0117 # 03 Y:1984 | 03 | 1984 | INSTALL STORM WINDOWS AND DOORS | $18,493 | $22,385 | Implemented |
UD0117 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,694 | $0 | Implemented |
UD0117 # 05 Y:1984 | 05 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $548 | $182 | Implemented |