IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0162 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $366 $300 Implemented
SD0121 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,420 $7,500 Implemented
SD0121 # 02 Y:1995 02 1995 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $3,648 $977 Implemented
SD0121 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $656 $702 Implemented
SD0121 # 04 Y:1995 04 1995 REDUCE EXCESSIVE BOILER BLOWDOWN $664 $15 Implemented
SD0121 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,118 $1,583 Implemented
SD0121 # 06 Y:1995 06 1995 ADD AREA LIGHTING SWITCHES $1,489 $800 Not Implemented
SD0121 # 07 Y:1995 07 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,093 $90 Not Implemented
SD0121 # 08 Y:1995 08 1995 USE PHOTOCELL CONTROLS $337 $135 Implemented
SD0121 # 09 Y:1995 09 1995 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,480 $0 Implemented
SD0121 # 10 Y:1995 10 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,433 $0 Implemented
WV0063 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,509 $2,400 Implemented
WV0063 # 02 Y:1995 02 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $778 $360 Not Implemented
WV0063 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,308 $15 Not Implemented
WV0063 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,103 $0 Implemented
MA0336 # 01 Y:1995 01 1995 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,427 $0 Implemented
MA0336 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $854 $2,191 Not Implemented
MA0336 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $580 Implemented
MA0336 # 04 Y:1995 04 1995 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $582 $0 Implemented
MA0336 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $461 $0 Implemented
TN0548 # 01 Y:1995 01 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,375 $0 Implemented
TN0548 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,247 $2,300 Implemented
TN0548 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $578 $980 Implemented
TN0548 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $905 $0 Not Implemented
TN0548 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $482 Implemented