IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0135 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,039 $350 Implemented
UD0443 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,736 $16,000 Implemented
UD0443 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $595 $1,280 Implemented
UD0443 # 03 Y:1994 03 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,063 $10,000 Implemented
UD0443 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $416 $2,000 Implemented
GT0539 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $2,445 Implemented
GT0539 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $400 Implemented
GT0539 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,060 $5,550 Implemented
GT0539 # 04 Y:1994 04 1994 ISOLATE HOT OR COLD EQUIPMENT $21,350 $34,500 Not Implemented
AR0043 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,278 $1,074 Implemented
AR0043 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,070 $540 Implemented
AR0043 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,361 $350 Implemented
AR0043 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,100 $1,000 Implemented
MA0310 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $30,270 $59,522 Implemented
MA0310 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,790 $23,672 Not Implemented
MA0310 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $0 Implemented
MA0310 # 04 Y:1994 04 1994 USE RADIANT HEATER FOR SPOT HEATING $5,208 $6,560 Implemented
MA0310 # 05 Y:1994 05 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,090 $0 Not Implemented
MA0310 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $323 $225 Not Implemented
MA0310 # 07 Y:1994 07 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,505 $2,697 Implemented
MA0310 # 08 Y:1994 08 1994 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,800 $0 Implemented
ME0142 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,892 $56,000 Not Implemented
ME0142 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,944 $17,480 Not Implemented
ME0142 # 03 Y:1994 03 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,073 $3,075 Not Implemented
ME0142 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,682 $250 Not Implemented