IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0866 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,542 $33,330 Not Implemented
GT0866 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,675 $122,352 Not Implemented
GT0839 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,582 $0 Implemented
GT0839 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,992 $1,000 Implemented
GT0839 # 03 Y:2007 03 2007 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $4,603 $5,050 Not Implemented
GT0839 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,858 $49,525 Implemented
GT0839 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,317 $5,346 Implemented
GT0826 # 06 Y:2006 06 2006 COMBINE UTILITY METERS $2,907 $7,120 Not Implemented
GT0826 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $282 $234 Not Implemented
GT0826 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $746 $400 Not Implemented
GT0826 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,167 $23,331 Not Implemented
GT0826 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $454 $280 Not Implemented
GT0826 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,095 $13,342 Not Implemented
GT0826 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,555 $0 Implemented
GT0788 # 10 Y:2004 10 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,462 $1,000 Not Implemented
GT0788 # 01 Y:2004 01 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $7,899 $0 Implemented
GT0788 # 02 Y:2004 02 2004 COMBINE UTILITY METERS $16,373 $0 Not Implemented
GT0788 # 03 Y:2004 03 2004 COVER OPEN TANKS $4,940 $3,185 Not Implemented
GT0788 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $13,315 $31,400 Not Implemented
GT0788 # 05 Y:2004 05 2004 AIR CONDITION ONLY SPACE NECESSARY $8,123 $3,450 Implemented
GT0788 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,890 $0 Implemented
GT0788 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $144 $1,100 Implemented
GT0788 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,396 $3,768 Implemented
GT0788 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $760 $1,200 Implemented
GT0709 # 07 Y:2001 07 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,125 $1,000 Not Implemented