Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0301 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,820 | $7,000 | Implemented |
MZ0301 # 08 Y:2020 | 08 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $304 | $52 | Implemented |
MZ0301 # 05 Y:2020 | 05 | 2020 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,963 | $4,300 | Not Implemented |
GT0951 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $9,097 | $34,730 | Not Implemented |
GT0951 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $79,957 | $675 | Implemented |
GT0951 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $126,097 | $4,500 | Implemented |
GT0951 # 03 Y:2020 | 03 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $18,092 | $2,000 | Not Implemented |
GT0951 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,307 | $2,255 | Implemented |
GT0951 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,280 | $66,564 | Implemented |
GT0951 # 09 Y:2020 | 09 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $201,113 | $1,989,215 | Not Implemented |
GT0951 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,162 | $4,561 | Implemented |
GT0951 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $21,155 | $29,319 | Not Implemented |
MI0378 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,840 | $2,673 | Not Implemented |
MI0378 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,828 | $480 | Implemented |
MI0378 # 03 Y:2020 | 03 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $7,580 | $6,182 | Not Implemented |
MI0378 # 10 Y:2020 | 10 | 2020 | ISOLATE HOT OR COLD EQUIPMENT | $671 | $560 | Not Implemented |
MI0378 # 09 Y:2020 | 09 | 2020 | USE PHOTOCELL CONTROLS | $981 | $1,141 | Not Implemented |
MI0378 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $1,344 | $1,042 | Not Implemented |
MI0378 # 07 Y:2020 | 07 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,694 | $1,195 | Implemented |
MI0378 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,909 | $1,980 | Implemented |
MI0378 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,502 | $2,100 | Implemented |
MI0378 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $11,160 | Implemented |
NL0052 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $11,815 | $4,420 | Not Implemented |
NL0052 # 02 Y:2020 | 02 | 2020 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $5,190 | $6,320 | Not Implemented |
NL0052 # 03 Y:2020 | 03 | 2020 | METER WASTE WATER | $4,017 | $580 | Implemented |