Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0212 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,372 | $212 | Implemented |
OK0212 # 05 Y:1986 | 05 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,167 | $1,575 | Implemented |
OK0212 # 06 Y:1986 | 06 | 1986 | INSTALL SET-BACK TIMERS | $1,748 | $0 | Implemented |
OK0212 # 07 Y:1986 | 07 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,133 | $0 | Implemented |
AT0054 # 01 Y:1986 | 01 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $820 | $986 | Implemented |
AT0054 # 02 Y:1986 | 02 | 1986 | IMPROVE LUBRICATION PRACTICES | $4,453 | $0 | Implemented |
AT0054 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $0 | Implemented |
AT0054 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,066 | $150 | Implemented |
AT0054 # 05 Y:1986 | 05 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,521 | $0 | Implemented |
AT0054 # 06 Y:1986 | 06 | 1986 | COVER OPEN TANKS | $7,949 | $1,850 | Implemented |
AT0054 # 07 Y:1986 | 07 | 1986 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $644 | $500 | Implemented |
AT0054 # 08 Y:1986 | 08 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $122 | $150 | Implemented |
AT0054 # 09 Y:1986 | 09 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,814 | $1,500 | Implemented |
ST0068 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,163 | $300 | Implemented |
ST0068 # 02 Y:1986 | 02 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $246 | $0 | Implemented |
ST0068 # 03 Y:1986 | 03 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $264 | $1,000 | Implemented |
ST0068 # 04 Y:1986 | 04 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $579 | $1,750 | Not Implemented |
ST0068 # 05 Y:1986 | 05 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,224 | $1,700 | Implemented |
ST0068 # 06 Y:1986 | 06 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,132 | $6,007 | Not Implemented |
ST0068 # 07 Y:1986 | 07 | 1986 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $112,028 | $82,000 | Implemented |
KU0201 # 01 Y:1986 | 01 | 1986 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,771 | $5,500 | Not Implemented |
KU0201 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,677 | $1,581 | Implemented |
KU0201 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,483 | $120 | Implemented |
KU0201 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,460 | $2,135 | Implemented |
KU0201 # 05 Y:1986 | 05 | 1986 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,243 | $90 | Implemented |