Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,504
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0118 # 10 Y:1984 | 10 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $55 | Not Implemented |
KU0118 # 11 Y:1984 | 11 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $519 | $200 | Implemented |
KU0118 # 12 Y:1984 | 12 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $325 | $0 | Implemented |
UD0116 # 05 Y:1984 | 05 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $28,956 | $69,700 | Not Implemented |
UD0116 # 06 Y:1984 | 06 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,705 | $3,000 | Not Implemented |
KU0114 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,055 | $2,514 | Not Implemented |
KU0114 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,440 | $1,100 | Implemented |
KU0114 # 03 Y:1984 | 03 | 1984 | INSTALL TURBULATORS | $2,447 | $2,080 | Not Implemented |
KU0114 # 04 Y:1984 | 04 | 1984 | REPAIR OR REPLACE STEAM TRAPS | $3,475 | $1,000 | Not Implemented |
KU0114 # 05 Y:1984 | 05 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $1,407 | $263 | Implemented |
KU0114 # 06 Y:1984 | 06 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,004 | $310 | Not Implemented |
KU0114 # 07 Y:1984 | 07 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $2,040 | $200 | Not Implemented |
KU0114 # 08 Y:1984 | 08 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $1,563 | $200 | Not Implemented |
KU0114 # 09 Y:1984 | 09 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,002 | $1,050 | Not Implemented |
UD0116 # 01 Y:1984 | 01 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $22,546 | $27,000 | Not Implemented |
UD0116 # 02 Y:1984 | 02 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,320 | $3,000 | Implemented |
UD0116 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,013 | $670 | Implemented |
UD0116 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $18,628 | $99,000 | Implemented |
OK0121 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,384 | $2,880 | Implemented |
OK0121 # 02 Y:1984 | 02 | 1984 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,065 | $0 | Not Implemented |
OK0121 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $557 | $650 | Not Implemented |
OK0121 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,510 | $174,400 | Implemented |
OK0121 # 05 Y:1984 | 05 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,956 | $928 | Implemented |
OK0121 # 06 Y:1984 | 06 | 1984 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $323,750 | $847,440 | Not Implemented |
OK0113 # 01 Y:1984 | 01 | 1984 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $304 | $280 | Not Implemented |