IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0052 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $2,000 Implemented
NL0052 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,375 $2,354 Implemented
NL0052 # 03 Y:2020 03 2020 METER WASTE WATER $4,017 $580 Implemented
NL0052 # 02 Y:2020 02 2020 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $5,190 $6,320 Not Implemented
NL0052 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $11,815 $4,420 Not Implemented
SD0596 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,809 $30,150 Not Implemented
SD0596 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,628 $300 Not Implemented
SD0596 # 03 Y:2020 03 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,037 $2,560 Not Implemented
SD0596 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,711 $0 Not Implemented
MZ0295 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,599 $34,694 Implemented
MZ0295 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,700 $3,360 Implemented
MZ0295 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $52,781 $20,000 Not Implemented
MZ0295 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,272 $240 Implemented
MZ0295 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,280 $550 Implemented
MZ0295 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,658 $3,500 Implemented
MZ0295 # 07 Y:2020 07 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,773 $1,390 Not Implemented
MZ0295 # 08 Y:2020 08 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,561 $360 Implemented
MZ0295 # 09 Y:2020 09 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $675 $322 Implemented
MZ0295 # 10 Y:2020 10 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,456 $9,000 Not Implemented
AM0800 # 01 Y:2020 01 2020 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $487,100 $3,000 Implemented
AM0800 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $2,460 Implemented
AM0800 # 03 Y:2020 03 2020 PAY UTILITY BILLS ON TIME $2,148 $0 Implemented
AM0800 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $267 Implemented
AM0800 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $40 Implemented
AM0800 # 06 Y:2020 06 2020 USE SYNTHETIC LUBRICANT $395 $150 Implemented