IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0268 # 03 Y:2003 03 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,491 $2,000 Not Implemented
NC0268 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $693 $500 Implemented
NC0268 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $162 $329 Not Implemented
NC0268 # 06 Y:2003 06 2003 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $1,012 $300 Not Implemented
TN0673 # 01 Y:2000 01 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,075 $2,610 Implemented
TN0673 # 02 Y:2000 02 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $980 $1,075 Not Implemented
TN0673 # 03 Y:2000 03 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $715 $1,820 Not Implemented
TN0673 # 04 Y:2000 04 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $710 $0 Not Implemented
TN0673 # 05 Y:2000 05 2000 USE A RAG RECYCLE SERVICE $240 $0 Not Implemented
TN0673 # 06 Y:2000 06 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $160 $0 Implemented
TN0549 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $890 $1,520 Implemented
TN0549 # 02 Y:1995 02 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,249 $4,640 Not Implemented
TN0549 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,374 $770 Not Implemented
NC0004 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,514 $1,222 Implemented
NC0004 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $690 Implemented
NC0004 # 03 Y:1993 03 1993 RECOVER AND REUSE COOLING WATER $834 $500 Not Implemented
NC0004 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $26,384 $1,500 Not Implemented
NC0004 # 05 Y:1993 05 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,143 $1,100 Not Implemented
NC0004 # 06 Y:1993 06 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,494 $4,500 Not Implemented
AT0123 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,117 $1,131 Implemented
AT0123 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,033 $6,000 Implemented
AT0123 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,183 $1,000 Implemented
AT0123 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $392 $600 Implemented
AT0123 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $972 $600 Implemented
AT0123 # 06 Y:1989 06 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $709 $0 Not Implemented