IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

265

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0225 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $1,491 $760 Not Implemented
MZ0225 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $4,675 Implemented
MZ0225 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,904 $15,775 Implemented
MZ0225 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,716 $5,600 Not Implemented
MZ0225 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,752 $550 Implemented
MZ0225 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,463 $2,250 Implemented
MZ0225 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,852 $1,250 Implemented
MZ0225 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $525 $50 Implemented
MZ0225 # 01 Y:2017 01 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,149 $22,600 Implemented
MZ0186 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $83 $0 Implemented
MZ0186 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,104 $1,160 Implemented
MZ0186 # 02 Y:2015 02 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $5,641 $18,600 Not Implemented
MZ0186 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $5,513 $5,100 Implemented
MZ0134 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $2,852 $1,614 Not Implemented
MZ0134 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,932 $2,000 Not Implemented
MZ0134 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,688 $16,575 Not Implemented
MZ0134 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,322 $1,333 Not Implemented
MZ0134 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,044 $2,500 Implemented
MZ0134 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $22,321 $12,640 Not Implemented
MZ0134 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,250 $61,965 Implemented
MZ0114 # 05 Y:2013 05 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $661 $1,000 Not Implemented
MZ0114 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $8,005 $8,200 Not Implemented
MZ0114 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $6,340 $9,450 Implemented
MZ0114 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,715 $10,000 Not Implemented
MZ0114 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $338 $50 Implemented