IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0044 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $609 $200 Not Implemented
ST0032 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $64 Implemented
ST0032 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $72 $42 Not Implemented
ST0032 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,640 $688 Not Implemented
ST0032 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $890 $1,900 Implemented
ST0032 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,974 $900 Not Implemented
ST0032 # 06 Y:1985 06 1985 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $2,416 $5,000 Not Implemented
ST0032 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $305 $0 Not Implemented
ST0032 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $380 $1,140 Not Implemented
ST0032 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $503 $380 Not Implemented
ST0014 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,127 $2,011 Implemented
ST0014 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $4,934 $500 Implemented
ST0014 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $722 $85 Implemented
ST0014 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,504 $537 Implemented
ST0014 # 05 Y:1985 05 1985 INSTALL AUTOMATIC STACK DAMPER $3,141 $6,344 Implemented
ST0014 # 06 Y:1985 06 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,403 $6,000 Implemented
ST0014 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $527 $0 Implemented
ST0014 # 08 Y:1985 08 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,305 $200 Implemented
ST0014 # 09 Y:1985 09 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $2,840 $23 Not Implemented
ST0014 # 10 Y:1985 10 1985 INSTALL TIMERS AND/OR THERMOSTATS $14,474 $50 Implemented
ST0004 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $599 $537 Implemented
ST0004 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,185 $200 Implemented
ST0004 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,058 $40 Implemented
ST0004 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $583 $1,480 Implemented
ST0004 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $990 $960 Implemented