IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0142 # 18 Y:1984 18 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $108 $62 Not Implemented
KU0142 # 19 Y:1984 19 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
KU0118 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,757 $500 Implemented
KU0118 # 02 Y:1984 02 1984 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,332 $800 Not Implemented
KU0118 # 03 Y:1984 03 1984 AIR CONDITION ONLY SPACE NECESSARY $3,948 $700 Not Implemented
KU0118 # 04 Y:1984 04 1984 INSTALL AUTOMATIC STACK DAMPER $1,032 $1,400 Not Implemented
KU0118 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $883 $0 Implemented
KU0118 # 06 Y:1984 06 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $866 $0 Implemented
KU0118 # 07 Y:1984 07 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $463 $0 Implemented
KU0118 # 08 Y:1984 08 1984 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $386 $400 Not Implemented
KU0118 # 09 Y:1984 09 1984 IMPROVE LUBRICATION PRACTICES $386 $500 Not Implemented
KU0118 # 10 Y:1984 10 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $55 Not Implemented
KU0118 # 11 Y:1984 11 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $200 Implemented
KU0118 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $325 $0 Implemented
KU0114 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,055 $2,514 Not Implemented
KU0114 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,440 $1,100 Implemented
KU0114 # 03 Y:1984 03 1984 INSTALL TURBULATORS $2,447 $2,080 Not Implemented
KU0114 # 04 Y:1984 04 1984 REPAIR OR REPLACE STEAM TRAPS $3,475 $1,000 Not Implemented
KU0114 # 05 Y:1984 05 1984 AIR CONDITION ONLY SPACE NECESSARY $1,407 $263 Implemented
KU0114 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $310 Not Implemented
KU0114 # 07 Y:1984 07 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,040 $200 Not Implemented
KU0114 # 08 Y:1984 08 1984 INSTALL TIMERS AND/OR THERMOSTATS $1,563 $200 Not Implemented
KU0114 # 09 Y:1984 09 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,002 $1,050 Not Implemented
KU0083 # 01 Y:1983 01 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,609 $6,500 Not Implemented
KU0083 # 02 Y:1983 02 1983 COVER OPEN TANKS $5,578 $0 Not Implemented