Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1984 |
Principal Product | GRAIN STORAGE BINS |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 35,000 Tons |
Production Hrs. Annual | 2,168 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $312,444 | 5,009,965 | kWh | $0.06 |
Natural Gas | $273,508 | 53,306 | MMBtu | $5.13 |
TOTAL ENERGY COSTS | $585,952 | |||
RECOMMENDED SAVINGS* | $188,564 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $174,785 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $94,910 Cost: $8,142 |
$12,880 | 206,624 | $82,030 | 15,990 |
$12,880 206,624 kWh |
$82,030 15,990 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $43,246 Cost: - |
- | - | $43,246 | 8,430 |
- - kWh |
$43,246 8,430 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,724 Cost: - |
$2,046 | 32,825 | $2,678 | 522 |
$2,046 32,825 kWh |
$2,678 522 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,695 Cost: $2,171 |
$4,695 | 75,322 | - | - |
$4,695 75,322 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $12,405 Cost: $9,000 |
$12,405 | 199,004 | - | - |
$12,405 199,004 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,842 Cost: $5,000 |
$4,842 | 77,667 | - | - |
$4,842 77,667 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,608 Cost: $1,500 |
$1,608 | 25,791 | - | - |
$1,608 25,791 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2111 INSTALL STEAM TRAP |
Savings: $6,325 Cost: $2,800 |
- | - | $6,325 | 1,233 |
- - kWh |
$6,325 1,233 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $2,786 Cost: $3,300 |
- | - | $2,786 | 543 |
- - kWh |
$2,786 543 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $2,678 Cost: $3,800 |
- | - | $2,678 | 522 |
- - kWh |
$2,678 522 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $2,360 Cost: $3,500 |
$2,360 | - | - | - |
$2,360 - kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,883 Cost: $75 |
- | - | $1,883 | 367 |
- - kWh |
$1,883 367 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,590 Cost: - |
$1,590 | 25,498 | - | - |
$1,590 25,498 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,606 Cost: - |
- | - | $3,606 | 703 |
- - kWh |
$3,606 703 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $292 Cost: $400 |
$292 | 4,689 | - | - |
$292 4,689 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $108 Cost: $62 |
- | - | $108 | 21 |
- - kWh |
$108 21 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
19: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $506 Cost: - |
$439 | 7,034 | $67 | 13 |
$439 7,034 kWh |
$67 13 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $188,564 Cost: $39,750 |
$43,157 | 654,454 | $145,407 | 28,344 | $43,157 654,454 kWh |
$145,407 28,344 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $174,785 Cost: $29,388 |
$41,275 | 624,267 | $133,510 | 26,025 | $41,275 624,267 kWh |
$133,510 26,025 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |