IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

265

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0114 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $252 $175 Implemented
MZ0114 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,771 $293 Implemented
MZ0063 # 06 Y:2011 06 2011 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,235 $2,700 Implemented
MZ0063 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,660 $50 Not Implemented
MZ0063 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,168 $1,200 Implemented
MZ0063 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $886 $3,000 Implemented
MZ0063 # 02 Y:2011 02 2011 ADJUST VENTS TO MINIMIZE ENERGY USE $1,007 $240 Implemented
MZ0063 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $480 Implemented
MZ0027 # 06 Y:2008 06 2008 HEAT WATER WITH EXHAUST HEAT $9,936 $10,000 Not Implemented
MZ0027 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,444 $30,600 Not Implemented
MZ0027 # 04 Y:2008 04 2008 USE OPTIMUM THICKNESS INSULATION $76 $300 Not Implemented
MZ0027 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $1,400 Not Implemented
MZ0027 # 02 Y:2008 02 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $514 $1,400 Not Implemented
MZ0027 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,642 $900 Not Implemented
MZ0022 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $11,853 $5,458 Implemented
MZ0022 # 01 Y:2008 01 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,425 $2,800 Implemented
MZ0022 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $900 Implemented
MZ0022 # 04 Y:2008 04 2008 ELIMINATE/REDUCE AN OPERATION $41,408 $0 Implemented
MZ0004 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,950 $24,700 Not Implemented
MZ0004 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,138 $2,230 Implemented
MZ0004 # 02 Y:2007 02 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $18,457 $3,412 Not Implemented
MZ0004 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,707 $1,300 Not Implemented
MZ0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $184 $150 Implemented
MZ0004 # 06 Y:2007 06 2007 DISCONNECT BALLASTS $19,720 $1,050 Not Implemented
MZ0004 # 09 Y:2007 09 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,600 $0 Implemented