IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0413 # 06 Y:2010 06 2010 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $24,889 $9,534 Implemented
WV0413 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,418 $0 Implemented
WV0413 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,163 $1,048 Not Implemented
WV0413 # 09 Y:2010 09 2010 DEVELOP A REPAIR/REPLACE POLICY $10,138 $1,674 Implemented
WV0413 # 10 Y:2010 10 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,565 $7,770 Not Implemented
WV0413 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,414 $0 Implemented
WV0413 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,242 $16,759 Implemented
WV0413 # 13 Y:2010 13 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,528 $1,876 Not Implemented
WV0413 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,830 $6,571 Implemented
WV0413 # 15 Y:2010 15 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,069 $1,000 Implemented
WV0413 # 16 Y:2010 16 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $288 $357 Implemented
LE0288 # 01 Y:2009 01 2009 USE RADIANT HEATER FOR SPOT HEATING $25,233 $33,000 Not Implemented
LE0288 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,606 $1,000 Not Implemented
LE0288 # 03 Y:2009 03 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,851 $2,500 Implemented
LE0288 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,293 $8,000 Not Implemented
LE0288 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,989 $2,500 Implemented
LE0288 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,929 $2,000 Implemented
LE0288 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,326 $168 Not Implemented
LE0288 # 08 Y:2009 08 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,311 $3,200 Not Implemented
LE0288 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,531 $76,000 Implemented
LE0288 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,689 $7,272 Implemented
LE0288 # 11 Y:2009 11 2009 INSTALL OCCUPANCY SENSORS $4,090 $1,890 Not Implemented
DL0034 # 01 Y:2009 01 2009 INSTALL TIMERS AND/OR THERMOSTATS $5,400 $3,600 Not Implemented
DL0034 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,702 $5,000 Not Implemented
DL0034 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,700 $4,440 Not Implemented