IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0220 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,586 $500 Implemented
LE0220 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $594 $450 Implemented
LE0220 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $377 $80 Implemented
LE0220 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $298 $450 Not Implemented
LE0220 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $25,315 Implemented
SU0216 # 01 Y:2005 01 2005 UPGRADE OBSOLETE EQUIPMENT $3,046 $0 Not Implemented
SU0216 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $103 $0 Implemented
SU0216 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $294 Implemented
SU0216 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $193 $300 Implemented
SU0216 # 05 Y:2005 05 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $60,060 $134,400 Implemented
SU0216 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $981 Implemented
SU0216 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,140 $3,550 Not Implemented
SU0216 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,013 $17,360 Implemented
SU0216 # 09 Y:2005 09 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $389 $1,520 Not Implemented
AS0404 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $60,950 $0 Not Implemented
AS0404 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,578 $45,427 Not Implemented
AS0404 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $6,521 $11,360 Not Implemented
AS0404 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,338 $3,000 Not Implemented
AS0404 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,106 $50 Not Implemented
AS0404 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $197 $97 Not Implemented
UD0722 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $113,700 $454,800 Not Implemented
UD0722 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $6,570 $21,200 Not Implemented
UD0722 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,334 $192 Implemented
UD0722 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $2,776 $1,448 Implemented
UD0722 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,734 $9,650 Implemented