IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,493

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0064 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $458 Not Implemented
MI0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $57,321 $6,188 Implemented
MI0064 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,458 $32,500 Not Implemented
MI0064 # 06 Y:2003 06 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,223 $9 Implemented
UU0047 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,212 $710 Implemented
UU0047 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,536 $4,800 Not Implemented
UU0047 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,044 $9,000 Implemented
UU0047 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,693 $0 Not Implemented
UU0047 # 05 Y:2003 05 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,430 $7,126 Not Implemented
UU0047 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $301 $150 Implemented
UU0047 # 07 Y:2003 07 2003 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $4,941 $765 Not Implemented
LL0169 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,185 $1,605 Implemented
LL0169 # 02 Y:2003 02 2003 USE POWER DURING OFF-PEAK PERIODS $16,056 $0 Not Implemented
LL0169 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $6,266 $4,116 Not Implemented
LL0169 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,298 $6,000 Implemented
LL0169 # 05 Y:2003 05 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,406 $159 Implemented
LL0169 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,233 $700 Not Implemented
SD0326 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $44,623 $0 Not Implemented
SD0326 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,397 $4,000 Implemented
SD0326 # 03 Y:2003 03 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,861 $20,000 Not Implemented
SD0326 # 04 Y:2003 04 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $14,893 $7,700 Not Implemented
SD0326 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,795 $384 Not Implemented
SD0326 # 06 Y:2003 06 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,905 $7,000 Not Implemented
SD0326 # 07 Y:2003 07 2003 USE PHOTOCELL CONTROLS $4,846 $6,000 Not Implemented
SD0326 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $2,034 $500 Not Implemented