IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0175 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,190 $15 Not Implemented
LL0175 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $746 $56 Not Implemented
LL0175 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $594 $800 Not Implemented
LL0175 # 06 Y:2003 06 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $40,875 $100,279 Not Implemented
LL0175 # 07 Y:2003 07 2003 COMBINE UTILITY METERS $1,625 $0 Not Implemented
MS0233 # 01 Y:2003 01 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $200,928 $9,650 Implemented
MS0233 # 02 Y:2003 02 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $67,762 $79,500 Not Implemented
MS0233 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $19,274 $21,420 Implemented
MS0233 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,291 $36,800 Implemented
MS0233 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $11,372 $2,900 Implemented
MS0233 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,999 $748 Implemented
MS0233 # 07 Y:2003 07 2003 USE SYNTHETIC LUBRICANT $3,787 $1,210 Implemented
MS0233 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,622 $1,535 Not Implemented
MS0233 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $579 $968 Implemented
MI0064 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,766 $3,951 Not Implemented
MI0064 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $287 $24 Implemented
MI0064 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $458 Not Implemented
MI0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $57,321 $6,188 Implemented
MI0064 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,458 $32,500 Not Implemented
MI0064 # 06 Y:2003 06 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,223 $9 Implemented
UU0047 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,212 $710 Implemented
UU0047 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,536 $4,800 Not Implemented
UU0047 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,044 $9,000 Implemented
UU0047 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,693 $0 Not Implemented
UU0047 # 05 Y:2003 05 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,430 $7,126 Not Implemented