IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

288

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0430 # 05 Y:2023 05 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,834 $7,288 Implemented
MI0430 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,630 $580 Implemented
MI0430 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,475 $1,920 Not Implemented
MI0430 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,567 $3,751 Not Implemented
MI0430 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,292 $1,980 Implemented
MI0430 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,813 $470 Implemented
MI0430 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,086 $3,360 Not Implemented
UF0587 # 04 Y:2022 04 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,425 $36,450 Not Implemented
UF0587 # 02 Y:2022 02 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,027 $20,000 Not Implemented
UF0587 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $133,034 $448,875 Not Implemented
UF0587 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,312 $11,024 Not Implemented
UF0587 # 08 Y:2022 08 2022 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,274 $0 Implemented
UF0587 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,229 $0 Not Implemented
UF0587 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,086 $356 Implemented
UF0587 # 07 Y:2022 07 2022 IMPROVE SPACE COMFORT CONDITIONING $15,247 $4,480 Implemented
MI0402 # 03 Y:2022 03 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,485 $12,386 Not Implemented
MI0402 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,047 $2,100 Implemented
MI0402 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,196 $5,530 Not Implemented
MI0402 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,039 $5,244 Implemented
MI0402 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,050 $1,980 Implemented
MI0402 # 07 Y:2022 07 2022 USE COMPRESSOR AIR FILTERS $934 $580 Implemented
MI0402 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,776 $580 Not Implemented
UF0561 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,816 $421 Implemented
UF0561 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,043 $0 Implemented
UF0561 # 06 Y:2020 06 2020 USE PHOTOCELL CONTROLS $7,062 $4,098 Implemented