Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0845 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $286 | $1,500 | Not Implemented |
UD0845 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $0 | Implemented |
UD0845 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,244 | $500 | Not Implemented |
UD0845 # 05 Y:2011 | 05 | 2011 | REDUCE HEAT GAIN BY WINDOW TINTING | $533 | $0 | Not Implemented |
UD0845 # 03 Y:2011 | 03 | 2011 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,285 | $4,000 | Implemented |
UM0398 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,477 | $500 | Implemented |
UM0398 # 04 Y:2011 | 04 | 2011 | INSULATE BARE EQUIPMENT | $1,482 | $1,157 | Implemented |
UM0398 # 01 Y:2011 | 01 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,500 | $7,000 | Not Implemented |
UM0398 # 03 Y:2011 | 03 | 2011 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,186 | $0 | Implemented |
UM0398 # 02 Y:2011 | 02 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,496 | $10,350 | Not Implemented |
UA3016 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,180 | $1,500 | Implemented |
UA3016 # 05 Y:2011 | 05 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,784 | $2,000 | Not Implemented |
UA3016 # 04 Y:2011 | 04 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,387 | $2,291 | Not Implemented |
UA3016 # 02 Y:2011 | 02 | 2011 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $3,721 | $3,550 | Not Implemented |
UA3016 # 01 Y:2011 | 01 | 2011 | BURN WOOD BY-PRODUCTS FOR HEAT | $19,294 | $53,500 | Not Implemented |
BD0399 # 02 Y:2011 | 02 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,396 | $2,000 | Implemented |
BD0399 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $6,021 | $8,100 | Implemented |
BD0399 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,480 | $20 | Not Implemented |
BD0399 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,514 | $31,299 | Not Implemented |
BD0399 # 01 Y:2011 | 01 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,451 | $55,000 | Not Implemented |
NC0433 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,299 | $50 | Implemented |
NC0433 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,334 | $100 | Implemented |
NC0433 # 06 Y:2011 | 06 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,685 | $29,025 | Not Implemented |
NC0433 # 07 Y:2011 | 07 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $2,159 | $3,999 | Implemented |
NC0433 # 08 Y:2011 | 08 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $276 | $0 | Not Implemented |