IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

495

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0178 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $34,000 $38,500 Implemented
AM0178 # 05 Y:1993 05 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,280 $0 Implemented
OK0389 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,084 $200 Implemented
OK0389 # 03 Y:1992 03 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,437 $1,350 Implemented
OK0389 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $941 $1,348 Implemented
OK0389 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $1,385 Implemented
SD0022 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,880 $1,817 Implemented
SD0022 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,846 $2,000 Implemented
SD0022 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $15 Implemented
SD0022 # 04 Y:1992 04 1992 COVER OPEN TANKS $516 $169 Implemented
SD0022 # 05 Y:1992 05 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $158 $138 Implemented
SD0022 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $138 $122 Implemented
SD0022 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $584 $999 Implemented
SD0022 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $2,200 Implemented
SD0022 # 10 Y:1992 10 1992 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,222 $0 Implemented
CO0243 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,490 $250 Implemented
CO0243 # 02 Y:1992 02 1992 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $11,590 $5,500 Implemented
CO0243 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,100 $230 Implemented
CO0243 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $220 Implemented
CO0243 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $230 $590 Implemented
CO0243 # 06 Y:1992 06 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,380 $5,600 Implemented
CO0243 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,540 $16,210 Implemented
CO0243 # 08 Y:1992 08 1992 USE MINIMUM SAFE OVEN VENTILATION $260 $680 Implemented
CO0243 # 09 Y:1992 09 1992 INSULATE BARE EQUIPMENT $610 $3,410 Implemented
KU0369 # 03 Y:1992 03 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,781 $430 Implemented