IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0235 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,100 Implemented
GT0235 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $473 Implemented
GT0235 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $250 Implemented
CO0006 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $105 $300 Implemented
CO0006 # 09 Y:1984 09 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $164 $60 Implemented
CO0006 # 08 Y:1984 08 1984 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $134 $200 Implemented
CO0006 # 07 Y:1984 07 1984 INSTALL TIMERS AND/OR THERMOSTATS $347 $125 Implemented
CO0006 # 05 Y:1984 05 1984 RECOVER WASTE HEAT FROM EQUIPMENT $288 $150 Implemented
CO0006 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $820 $1,939 Implemented
CO0006 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $20 Implemented
CO0006 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $300 Implemented
KU0118 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,757 $500 Implemented
KU0118 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $883 $0 Implemented
KU0118 # 06 Y:1984 06 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $866 $0 Implemented
KU0118 # 07 Y:1984 07 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $463 $0 Implemented
KU0118 # 11 Y:1984 11 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $200 Implemented
KU0118 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $325 $0 Implemented
OK0121 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,384 $2,880 Implemented
OK0121 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,510 $174,400 Implemented
OK0121 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,956 $928 Implemented
OK0113 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $235 Implemented