Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3441 | Fabricated Structural Metal |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0486 # 07 Y:2014 | 07 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $262 | $519 | Implemented |
WV0486 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $558 | $75 | Implemented |
WV0486 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $846 | $3,700 | Not Implemented |
WV0486 # 04 Y:2014 | 04 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,358 | $1,000 | Implemented |
WV0486 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,550 | $688 | Implemented |
WV0486 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,397 | $51,976 | Implemented |
WV0486 # 01 Y:2014 | 01 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $27,561 | $100,000 | Not Implemented |
LE0337 # 05 Y:2012 | 05 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,107 | $2,500 | Not Implemented |
LE0337 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,020 | $1,562 | Not Implemented |
LE0337 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $11,678 | $19,140 | Not Implemented |
LE0337 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,684 | $1,000 | Not Implemented |
LE0337 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,631 | $28,000 | Not Implemented |
DL0034 # 02 Y:2009 | 02 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,702 | $5,000 | Not Implemented |
DL0034 # 08 Y:2009 | 08 | 2009 | ADD AREA LIGHTING SWITCHES | $313 | $197 | Implemented |
DL0034 # 07 Y:2009 | 07 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $700 | $0 | Implemented |
DL0034 # 06 Y:2009 | 06 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,735 | $18,313 | Implemented |
DL0034 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,600 | $4,000 | Implemented |
DL0034 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,489 | $55,984 | Implemented |
DL0034 # 03 Y:2009 | 03 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,700 | $4,440 | Not Implemented |
DL0034 # 01 Y:2009 | 01 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $5,400 | $3,600 | Not Implemented |
HO0169 # 06 Y:1998 | 06 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $35,663 | $10,400 | Not Implemented |
HO0169 # 07 Y:1998 | 07 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $22,500 | $14,400 | Implemented |
HO0169 # 08 Y:1998 | 08 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,000 | $1,000 | Implemented |
HO0169 # 05 Y:1998 | 05 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,956 | $6,500 | Not Implemented |
HO0169 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $777 | $800 | Implemented |