Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | concrete industry products |
NAICS | n/a |
SIC | 3441 - Fabricated Structural Metal |
Sales | $50,000,000-$100,000,000 |
# of Employees | 103 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 24,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $301,349 | 4,272,861 | kWh | $0.07 |
Electricity Demand | $44,971 | 14,368 | kW-months/year | $3.13 |
Electricity Fees | $(-2,629) | - | $ | - |
TOTAL ENERGY COSTS | $403,691 | |||
RECOMMENDED SAVINGS* | $67,253 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,634 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,077 Cost: $6,192 |
$1,792 | 25,498 | $285 | 91 | - | - | - | - |
$1,792 25,498 kWh |
$285 91 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,676 Cost: $4,900 |
$1,541 | 21,981 | $135 | 43 | - | - | - | - |
$1,541 21,981 kWh |
$135 43 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,604 Cost: $2,236 |
$1,604 | 22,567 | - | - | - | - | - | - |
$1,604 22,567 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $777 Cost: $800 |
$714 | 10,258 | $63 | 20 | - | - | - | - |
$714 10,258 kWh |
$63 20 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,956 Cost: $6,500 |
- | - | - | - | $1,956 | 50,400 | - | - |
- - kWh |
- - kW-months/year |
$1,956 50,400 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $35,663 Cost: $10,400 |
$35,663 | 505,862 | - | - | - | - | - | - |
$35,663 505,862 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $22,500 Cost: $14,400 |
- | - | - | - | - | - | $22,500 | - |
- - kWh |
- - kW-months/year |
- - lb |
$22,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $1,000 Cost: $1,000 |
- | - | - | - | $1,000 | 1,000 | - | - |
- - kWh |
- - kW-months/year |
$1,000 1,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $67,253 Cost: $46,428 |
$41,314 | 586,166 | $483 | 154 | $2,956 | 51,400 | $22,500 | - | $41,314 586,166 kWh |
$483 154 kW-months/year |
$2,956 51,400 lb |
$22,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,634 Cost: $29,528 |
$5,651 | 80,304 | $483 | 154 | $1,000 | 1,000 | $22,500 | - | $5,651 80,304 kWh |
$483 154 kW-months/year |
$1,000 1,000 lb |
$22,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |