IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,112

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0812 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,750 $21,000 Not Implemented
UD0812 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,335 $2,310 Not Implemented
UD0812 # 09 Y:2010 09 2010 COVER OPEN TANKS $4,280 $3,600 Not Implemented
UD0812 # 10 Y:2010 10 2010 OPTIMIZE PLANT POWER FACTOR $1,963 $5,000 Not Implemented
UD0812 # 11 Y:2010 11 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $800 $2,500 Not Implemented
UD0812 # 12 Y:2010 12 2010 INSTALL AUTOMATIC STACK DAMPER $20,826 $200 Not Implemented
UD0812 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,114 $70,000 Not Implemented
UD0812 # 14 Y:2010 14 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,930 $10,000 Not Implemented
UD0812 # 15 Y:2010 15 2010 INSTALL AUTOMATIC STACK DAMPER $15,975 $8,500 Not Implemented
DL0034 # 01 Y:2009 01 2009 INSTALL TIMERS AND/OR THERMOSTATS $5,400 $3,600 Not Implemented
DL0034 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,702 $5,000 Not Implemented
DL0034 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,700 $4,440 Not Implemented
DL0034 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,489 $55,984 Implemented
DL0034 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $4,000 Implemented
DL0034 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,735 $18,313 Implemented
DL0034 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $700 $0 Implemented
DL0034 # 08 Y:2009 08 2009 ADD AREA LIGHTING SWITCHES $313 $197 Implemented
AM0546 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $33,360 $17,050 Not Implemented
AM0546 # 02 Y:2008 02 2008 INSTALL SKYLIGHTS $22,310 $8 Not Implemented
AM0546 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,520 $2,000 Not Implemented
AM0546 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,325 $15,150 Not Implemented
AM0546 # 05 Y:2008 05 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,700 $0 Not Implemented
AM0546 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,070 $0 Not Implemented
AM0546 # 07 Y:2008 07 2008 OPTIMIZE PLANT POWER FACTOR $3,420 $7,755 Not Implemented
AM0546 # 08 Y:2008 08 2008 PAY BILLS ON TIME TO AVOID LATE FEES $2,447 $0 Not Implemented