IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,112

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0349 # 09 Y:2000 09 2000 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $967 $0 Not Implemented
OK0590 # 01 Y:2000 01 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,680 $250 Not Implemented
OK0590 # 02 Y:2000 02 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,824 $3,443 Not Implemented
OK0590 # 03 Y:2000 03 2000 BURN WASTE OIL FOR HEAT $2,892 $3,490 Implemented
OK0590 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,604 $5,081 Not Implemented
OK0590 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,743 $1,613 Implemented
OK0590 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $761 $1,440 Not Implemented
ME0284 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,752 $16,593 Not Implemented
ME0284 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,586 $8,987 Implemented
ME0284 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,090 $15,253 Implemented
ME0284 # 04 Y:2000 04 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $2,969 $250 Not Implemented
ME0284 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $992 $105 Not Implemented
AR0181 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $368 $340 Implemented
AR0181 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,363 $500 Implemented
AR0181 # 03 Y:2000 03 2000 FILTER AND REUSE HYDRAULIC OIL $3,552 $1,500 Not Implemented
AR0181 # 04 Y:2000 04 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $23,800 $16,000 Implemented
NV0134 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $5,222 $5,533 Not Implemented
NV0134 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,525 $344 Not Implemented
NV0134 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $150 Implemented
NV0134 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $18,506 $0 Not Implemented
NV0134 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,801 $62,350 Not Implemented
NV0134 # 06 Y:1999 06 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $13,650 $20,000 Not Implemented
IA0236 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,665 $16,153 Not Implemented
IA0236 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,409 $1,248 Not Implemented
IA0236 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,131 $394 Not Implemented