IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,107

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0155 # 10 Y:1985 10 1985 INSTALL AUTOMATIC STACK DAMPER $1,280 $975 Not Implemented
KU0155 # 11 Y:1985 11 1985 INSTALL TIMERS AND/OR THERMOSTATS $827 $300 Implemented
KU0155 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23 $0 Implemented
KU0155 # 13 Y:1985 13 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $434 $0 Not Implemented
KU0155 # 14 Y:1985 14 1985 USE RADIANT HEATER FOR SPOT HEATING $112 $25 Not Implemented
KU0155 # 15 Y:1985 15 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $393 $0 Implemented
KU0155 # 16 Y:1985 16 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $150 $0 Implemented
TN0225 # 01 Y:1984 01 1984 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,090 $13,000 Not Implemented
TN0225 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,768 $95 Not Implemented
TN0225 # 03 Y:1984 03 1984 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,670 $0 Not Implemented
TN0225 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,236 $500 Not Implemented
TN0225 # 05 Y:1984 05 1984 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $18,012 $10,000 Not Implemented
TN0225 # 06 Y:1984 06 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $0 Not Implemented
TN0225 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,159 $3,500 Not Implemented
GT0235 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $250 Implemented
GT0235 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $473 Implemented
GT0235 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,100 Implemented
CO0006 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $300 Implemented
CO0006 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $105 $300 Implemented
CO0006 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $20 Implemented
CO0006 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $820 $1,939 Implemented
CO0006 # 05 Y:1984 05 1984 RECOVER WASTE HEAT FROM EQUIPMENT $288 $150 Implemented
CO0006 # 06 Y:1984 06 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,708 $5,000 Not Implemented
CO0006 # 07 Y:1984 07 1984 INSTALL TIMERS AND/OR THERMOSTATS $347 $125 Implemented
CO0006 # 08 Y:1984 08 1984 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $134 $200 Implemented