IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0746 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $25,082 $120,593 n/a
CO0746 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $415 $0 n/a
CO0746 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $238 $279 n/a
CO0746 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,559 $7,100 n/a
CO0721 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,680 $57,330 Not Implemented
CO0721 # 03 Y:2016 03 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,080 $13,230 Not Implemented
CO0721 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $1,500 Implemented
CO0639 # 05 Y:2010 05 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,060 $3,620 Not Implemented
CO0639 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,710 $33,800 Not Implemented
CO0639 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,040 $13,990 Not Implemented
CO0639 # 02 Y:2010 02 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,600 $10,320 Not Implemented
CO0639 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $340 Implemented
CO0639 # 06 Y:2010 06 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $2,050 $35,000 Not Implemented
CO0474 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,930 $10,000 Implemented
CO0474 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $560 Implemented
CO0474 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,060 $2,250 Not Implemented
CO0474 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $0 Implemented
CO0474 # 05 Y:2000 05 2000 $329,200 $60,000 Implemented
CO0474 # 06 Y:2000 06 2000 $2,400 $0 Not Implemented
CO0373 # 06 Y:1996 06 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $840 $250 Implemented
CO0373 # 01 Y:1996 01 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,400 $49,500 Not Implemented
CO0373 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $688 $2,390 Implemented
CO0373 # 05 Y:1996 05 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $420 $620 Implemented
CO0373 # 04 Y:1996 04 1996 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $520 $1,000 Not Implemented
CO0373 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $167 $82 Implemented