IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0293 # 14 Y:1997 14 1997 INSTALL OCCUPANCY SENSORS $308 $225 n/a
WI0293 # 13 Y:1997 13 1997 PAY BILLS ON TIME TO AVOID LATE FEES $1,412 $0 n/a
WI0293 # 12 Y:1997 12 1997 MINIMIZE WATER USAGE $1,853 $0 n/a
WI0293 # 11 Y:1997 11 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,976 $8,000 n/a
WI0293 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $626 $1,280 n/a
WI0293 # 09 Y:1997 09 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $180 n/a
WI0293 # 08 Y:1997 08 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,600 $0 n/a
WI0293 # 07 Y:1997 07 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,404 $0 n/a
WI0293 # 06 Y:1997 06 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $7,350 $4,000 n/a
WI0293 # 05 Y:1997 05 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,025 $3,544 n/a
WI0293 # 04 Y:1997 04 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,037 $500 n/a
WI0293 # 03 Y:1997 03 1997 INSTALL TIMERS AND/OR THERMOSTATS $15,816 $1,400 n/a
WI0293 # 02 Y:1997 02 1997 REDUCE VENTILATION AIR $16,800 $4,000 n/a
WI0293 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $47,846 $2,000 n/a
WI0258 # 06 Y:1996 06 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,107 $500 Not Implemented
WI0258 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,800 $0 Not Implemented
WI0258 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,690 $1,600 Implemented
WI0258 # 03 Y:1996 03 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,447 $0 Implemented
WI0258 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,406 $50,000 Not Implemented
WI0258 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $9,926 $4,400 Implemented
WI0197 # 01 Y:1994 01 1994 UPGRADE OBSOLETE EQUIPMENT $16,304 $30,000 Implemented
WI0197 # 09 Y:1994 09 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $404 $0 Not Implemented
WI0197 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $167 $300 Not Implemented
WI0197 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $807 $525 Not Implemented
WI0197 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,900 $2,741 Not Implemented