Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
950
matching recommendationsSIC | 3441 | Fabricated Structural Metal |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0266 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $543 | n/a |
UU0266 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,550 | $22,000 | n/a |
UU0266 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,801 | $18,500 | n/a |
UU0266 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,730 | $6,960 | n/a |
UU0266 # 02 Y:2025 | 02 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $8,217 | $13,000 | n/a |
UU0266 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,681 | $22,500 | n/a |
UU0266 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,500 | $38,200 | n/a |
NT0035 # 05 Y:2025 | 05 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $7,352 | $5,000 | n/a |
NT0035 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $150,000 | $38,900 | n/a |
NT0035 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,196 | $5,609 | n/a |
NT0035 # 03 Y:2025 | 03 | 2025 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,000 | $5,300 | n/a |
NT0035 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $954 | $0 | n/a |
SU0555 # 01 Y:2024 | 01 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $923 | $0 | Implemented |
SU0555 # 10 Y:2024 | 10 | 2024 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,795 | $1,172 | Implemented |
SU0555 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,650 | $115 | Implemented |
SU0555 # 14 Y:2024 | 14 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,140 | $35,125 | Implemented |
SU0555 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,450 | $0 | Not Implemented |
SU0555 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $603 | $344 | Implemented |
SU0555 # 11 Y:2024 | 11 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $823 | $1,347 | Implemented |
SU0555 # 12 Y:2024 | 12 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $61,520 | $301,550 | Not Implemented |
SU0555 # 13 Y:2024 | 13 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $101 | $498 | Not Implemented |
SU0555 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,613 | $0 | Not Implemented |
SU0555 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,049 | $70 | Not Implemented |
SU0555 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $600 | $292 | Not Implemented |
SU0555 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $362 | $128 | Not Implemented |