IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

859

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0422 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231 $13,918 n/a
AS0422 # 05 Y:2006 05 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,824 $0 n/a
UU0100 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,720 $10,000 Not Implemented
UU0100 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $830 Not Implemented
UU0100 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,490 $165 Not Implemented
UU0100 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $740 Not Implemented
UU0100 # 05 Y:2006 05 2006 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,000 $10,000 Not Implemented
UU0100 # 06 Y:2006 06 2006 OPTIMIZE PLANT POWER FACTOR $4,280 $4,140 Not Implemented
BD0297 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $18,063 $50,400 Not Implemented
BD0297 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,422 $1,200 Implemented
BD0297 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,740 $2,500 Implemented
BD0297 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,600 $600 Implemented
BD0297 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,324 $6,150 Implemented
BD0297 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $823 $2,975 Implemented
BD0297 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $812 $1,625 Implemented
BD0297 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $688 $0 Implemented
BD0297 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $455 $600 Implemented
BD0297 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $422 $600 Implemented
BD0297 # 11 Y:2006 11 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $235 $140 Implemented
BD0297 # 12 Y:2006 12 2006 RECOVER AND REUSE COOLING WATER $42,543 $36,180 Implemented
BD0297 # 13 Y:2006 13 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $58,145 $9,400 Implemented
BD0298 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,476 $1,014 Implemented
BD0298 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $988 $140 Implemented
BD0298 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $902 $0 Not Implemented
BD0298 # 04 Y:2006 04 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $436 $1,200 Implemented