Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
859
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0655 # 02 Y:1998 | 02 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,690 | $1,250 | Implemented |
GT0655 # 03 Y:1998 | 03 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,582 | $3,116 | Not Implemented |
GT0655 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,677 | $4,550 | Implemented |
GT0655 # 05 Y:1998 | 05 | 1998 | MINIMIZE WATER USAGE | $6,576 | $0 | Implemented |
GT0655 # 06 Y:1998 | 06 | 1998 | CONVERT TO ELECTROSTATIC POWDER COATING | $7,580 | $4,800 | Not Implemented |
GT0655 # 07 Y:1998 | 07 | 1998 | CONVERT TO ELECTROSTATIC POWDER COATING | $4,410 | $5,400 | Not Implemented |
GT0655 # 08 Y:1998 | 08 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,500 | $0 | Not Implemented |
BD0119 # 01 Y:1998 | 01 | 1998 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,453 | $10,000 | n/a |
BD0119 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,670 | $4,000 | n/a |
BD0119 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,663 | $3,460 | n/a |
BD0119 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,434 | $400 | n/a |
BD0119 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,178 | $3,835 | n/a |
BD0119 # 06 Y:1998 | 06 | 1998 | INSTALL OCCUPANCY SENSORS | $1,158 | $600 | n/a |
BD0119 # 07 Y:1998 | 07 | 1998 | USE OPTIMUM THICKNESS INSULATION | $1,125 | $1,515 | n/a |
BD0119 # 08 Y:1998 | 08 | 1998 | USE OPTIMUM THICKNESS INSULATION | $549 | $2,127 | n/a |
BD0119 # 09 Y:1998 | 09 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $430 | n/a |
BD0119 # 10 Y:1998 | 10 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $230 | $205 | n/a |
BD0119 # 11 Y:1998 | 11 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $132,757 | $160,000 | n/a |
BD0119 # 12 Y:1998 | 12 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,430 | $14,000 | n/a |
BD0119 # 13 Y:1998 | 13 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $2,982 | $7,000 | n/a |
BD0119 # 14 Y:1998 | 14 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $4,359 | $14,000 | n/a |
BD0119 # 15 Y:1998 | 15 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,737 | $1,365 | n/a |
HO0186 # 01 Y:1998 | 01 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $268 | $0 | Implemented |
HO0186 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,988 | $0 | Implemented |
HO0186 # 03 Y:1998 | 03 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $6,903 | $6,000 | Not Implemented |