Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
859
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0321 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,356 | $19,970 | Not Implemented |
OK0321 # 04 Y:1990 | 04 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $451 | $502 | Not Implemented |
OK0321 # 05 Y:1990 | 05 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $102 | $0 | Implemented |
AS0010 # 01 Y:1990 | 01 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,459 | $0 | Implemented |
AS0010 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $591 | $758 | Implemented |
AS0010 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $3,149 | $261 | Implemented |
AS0010 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $7,665 | $2,474 | Implemented |
AS0010 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,125 | $2,587 | Implemented |
AS0010 # 06 Y:1990 | 06 | 1990 | KEEP LAMPS AND REFLECTORS CLEAN | $17,065 | $13,365 | Not Implemented |
AS0010 # 07 Y:1990 | 07 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $16,359 | $6,000 | Implemented |
AS0010 # 08 Y:1990 | 08 | 1990 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,640 | $1,000 | Not Implemented |
UD0307 # 01 Y:1990 | 01 | 1990 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $4,728 | $100 | Implemented |
UD0307 # 02 Y:1990 | 02 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $140 | $200 | Not Implemented |
UD0307 # 03 Y:1990 | 03 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $721 | $1,425 | Not Implemented |
GT0321 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,760 | $250 | Implemented |
GT0321 # 02 Y:1987 | 02 | 1987 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $9,000 | $1,900 | Not Implemented |
GT0321 # 03 Y:1987 | 03 | 1987 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $381 | $325 | Implemented |
GT0321 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,150 | $2,500 | Implemented |
GT0321 # 05 Y:1987 | 05 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,656 | $4,160 | Implemented |
GT0321 # 06 Y:1987 | 06 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $399 | $793 | Implemented |
KU0193 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,876 | $5,003 | Implemented |
KU0193 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $100 | Implemented |
KU0193 # 03 Y:1986 | 03 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $4,524 | $667 | Implemented |
KU0193 # 04 Y:1986 | 04 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $273 | $0 | Not Implemented |
KU0193 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,097 | $500 | Implemented |