IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

849

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0010 # 08 Y:1990 08 1990 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,640 $1,000 Not Implemented
UD0307 # 01 Y:1990 01 1990 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $4,728 $100 Implemented
UD0307 # 02 Y:1990 02 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $140 $200 Not Implemented
UD0307 # 03 Y:1990 03 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $721 $1,425 Not Implemented
GT0321 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,760 $250 Implemented
GT0321 # 02 Y:1987 02 1987 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $9,000 $1,900 Not Implemented
GT0321 # 03 Y:1987 03 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $381 $325 Implemented
GT0321 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,150 $2,500 Implemented
GT0321 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,656 $4,160 Implemented
GT0321 # 06 Y:1987 06 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $399 $793 Implemented
KU0193 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,876 $5,003 Implemented
KU0193 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $100 Implemented
KU0193 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,524 $667 Implemented
KU0193 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $273 $0 Not Implemented
KU0193 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $1,097 $500 Implemented
KU0193 # 06 Y:1986 06 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $802 $52 Not Implemented
KU0193 # 07 Y:1986 07 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $178 $75 Not Implemented
KU0193 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $111 $0 Implemented
KU0194 # 01 Y:1986 01 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $1,687 $0 Implemented
KU0194 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,003 $1,575 Implemented
KU0194 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $50 Implemented
UD0158 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,260 Implemented
UD0158 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $434 $280 Implemented
UD0158 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,850 $18,000 Not Implemented
UD0158 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $240 Implemented