Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0013 # 02 Y:2013 | 02 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $4,197 | $0 | Not Implemented |
IP0013 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Not Implemented |
IP0013 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $192 | $0 | Implemented |
IP0013 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,079 | $1,148 | Not Implemented |
IP0013 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $4,447 | $2,744 | Implemented |
IP0013 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,251 | $4,863 | Not Implemented |
IP0013 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $633 | $1,535 | Not Implemented |
IP0013 # 09 Y:2013 | 09 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,354 | $2,340 | Implemented |
IP0013 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,491 | $15,502 | Implemented |
IP0013 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,266 | $0 | Implemented |
ND0330 # 13 Y:1999 | 13 | 1999 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $2,990 | $250 | Implemented |
ND0330 # 12 Y:1999 | 12 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,763 | $750 | Not Implemented |
ND0330 # 11 Y:1999 | 11 | 1999 | USE SYNTHETIC LUBRICANT | $3,469 | $1,375 | Implemented |
ND0330 # 10 Y:1999 | 10 | 1999 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $3,873 | $17,271 | Implemented |
ND0330 # 09 Y:1999 | 09 | 1999 | MINIMIZE WATER USAGE | $821 | $960 | Not Implemented |
ND0330 # 08 Y:1999 | 08 | 1999 | REDUCE OR ELIMINATE WASTE | $1,067 | $95 | Implemented |
ND0330 # 07 Y:1999 | 07 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $131 | $350 | Not Implemented |
ND0330 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $5,430 | $4,252 | Implemented |
ND0330 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,337 | $1,000 | Not Implemented |
ND0330 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $3,950 | $3,800 | Implemented |
ND0330 # 03 Y:1999 | 03 | 1999 | USE OPTIMUM TEMPERATURE | $15 | $10 | Implemented |
ND0330 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $228 | $320 | Implemented |
ND0330 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,347 | $200 | Implemented |