IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0448 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $874 $1,500 Not Implemented
LE0448 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,228 $19,000 Not Implemented
LE0448 # 10 Y:2018 10 2018 INSTALL TIMERS AND/OR THERMOSTATS $3,580 $20,000 Not Implemented
LE0448 # 03 Y:2018 03 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,206 $20,625 Not Implemented
LE0448 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,450 $25 Implemented
LE0448 # 08 Y:2018 08 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,258 $30,000 Implemented
LE0448 # 01 Y:2018 01 2018 INSTALL TIMERS AND/OR THERMOSTATS $2,899 $25 Implemented
LE0448 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,721 $11,738 Implemented
LE0448 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,660 $5,250 Implemented
LE0448 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $843 $4,225 Implemented
LE0393 # 04 Y:2015 04 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $130 $75 Not Implemented
LE0393 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66 $289 Not Implemented
LE0393 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $1,313 Not Implemented
LE0393 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,261 $11,400 Not Implemented
LE0393 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,275 $4,018 Not Implemented
LE0393 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $15,747 $40,880 Not Implemented
LE0393 # 06 Y:2015 06 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,198 $3,052 Not Implemented
LE0393 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $181 $365 Not Implemented
LE0393 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,825 $1,000 Not Implemented
LE0393 # 02 Y:2015 02 2015 INSTALL TIMERS AND/OR THERMOSTATS $4,240 $1,125 Not Implemented
LE0393 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,445 $25 Not Implemented
LE0344 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,371 $375 Implemented
LE0344 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,850 $1,000 Not Implemented
LE0344 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $6,930 Not Implemented
LE0344 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $3,730 $10,374 Not Implemented