Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0655 # 08 Y:1998 | 08 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,500 | $0 | Not Implemented |
GT0655 # 07 Y:1998 | 07 | 1998 | CONVERT TO ELECTROSTATIC POWDER COATING | $4,410 | $5,400 | Not Implemented |
GT0655 # 06 Y:1998 | 06 | 1998 | CONVERT TO ELECTROSTATIC POWDER COATING | $7,580 | $4,800 | Not Implemented |
GT0655 # 05 Y:1998 | 05 | 1998 | MINIMIZE WATER USAGE | $6,576 | $0 | Implemented |
GT0655 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,677 | $4,550 | Implemented |
GT0655 # 03 Y:1998 | 03 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,582 | $3,116 | Not Implemented |
GT0655 # 02 Y:1998 | 02 | 1998 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,690 | $1,250 | Implemented |
GT0655 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $5,800 | $5,000 | Implemented |
BD0119 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,670 | $4,000 | n/a |
BD0119 # 15 Y:1998 | 15 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,737 | $1,365 | n/a |
BD0119 # 14 Y:1998 | 14 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $4,359 | $14,000 | n/a |
BD0119 # 13 Y:1998 | 13 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $2,982 | $7,000 | n/a |
BD0119 # 11 Y:1998 | 11 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $132,757 | $160,000 | n/a |
BD0119 # 10 Y:1998 | 10 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $230 | $205 | n/a |
BD0119 # 09 Y:1998 | 09 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $430 | n/a |
BD0119 # 08 Y:1998 | 08 | 1998 | USE OPTIMUM THICKNESS INSULATION | $549 | $2,127 | n/a |
BD0119 # 07 Y:1998 | 07 | 1998 | USE OPTIMUM THICKNESS INSULATION | $1,125 | $1,515 | n/a |
BD0119 # 06 Y:1998 | 06 | 1998 | INSTALL OCCUPANCY SENSORS | $1,158 | $600 | n/a |
BD0119 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,178 | $3,835 | n/a |
BD0119 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,434 | $400 | n/a |
BD0119 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,663 | $3,460 | n/a |
BD0119 # 01 Y:1998 | 01 | 1998 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,453 | $10,000 | n/a |
BD0119 # 12 Y:1998 | 12 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,430 | $14,000 | n/a |
HO0186 # 01 Y:1998 | 01 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $268 | $0 | Implemented |
HO0186 # 06 Y:1998 | 06 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $3,900 | $1,000 | Implemented |