IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 3442 Metal Doors, Sash, And Trim
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0280 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $243,000 $20,108 Implemented
ME0280 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $105,600 $6,000 Implemented
ME0280 # 03 Y:1999 03 1999 MODIFY CURRENT INCENTIVE PROGRAM $15,000 $0 Implemented
ME0280 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,958 $28,528 Implemented
ME0280 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,204 $1,000 Not Implemented
ME0280 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,402 $4,940 Implemented
ME0280 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,619 $1,000 Not Implemented
ME0280 # 08 Y:1999 08 1999 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,092 $1,240 Implemented
ME0280 # 09 Y:1999 09 1999 MODIFY CURRENT INCENTIVE PROGRAM $55,341 $30,500 Implemented
AM0358 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,566 $0 Not Implemented
AM0358 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,480 $1,500 Implemented
AM0358 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $115 $110 Implemented
AM0358 # 05 Y:1999 05 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $190 $0 Not Implemented
AM0358 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $1,700 $4,530 Implemented
AM0358 # 02 Y:1999 02 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,680 $80 Implemented
ND0330 # 13 Y:1999 13 1999 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $2,990 $250 Implemented
ND0330 # 10 Y:1999 10 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $3,873 $17,271 Implemented
ND0330 # 12 Y:1999 12 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,763 $750 Not Implemented
ND0330 # 11 Y:1999 11 1999 USE SYNTHETIC LUBRICANT $3,469 $1,375 Implemented
ND0330 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $3,950 $3,800 Implemented
ND0330 # 08 Y:1999 08 1999 REDUCE OR ELIMINATE WASTE $1,067 $95 Implemented
ND0330 # 07 Y:1999 07 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $131 $350 Not Implemented
ND0330 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $5,430 $4,252 Implemented
ND0330 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,337 $1,000 Not Implemented
ND0330 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $228 $320 Implemented