Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
39
matching recommendationsSIC | 3442 | Metal Doors, Sash, And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0174 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $32,694 | $2,000 | Implemented |
MI0174 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,544 | $40 | Implemented |
MI0174 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,041 | $1,210 | Implemented |
MI0174 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,087 | $13,200 | Not Implemented |
MI0174 # 06 Y:2008 | 06 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,075 | $322 | Implemented |
MI0174 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $214,998 | $360,000 | Not Implemented |
OK0768 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,145 | $16,980 | Not Implemented |
OK0768 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $2,027 | Not Implemented |
OK0768 # 08 Y:2008 | 08 | 2008 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $12,550 | $152,330 | Not Implemented |
OK0768 # 09 Y:2008 | 09 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,400 | $7,484 | Not Implemented |
OK0768 # 10 Y:2008 | 10 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,626 | $749 | Not Implemented |
OK0768 # 11 Y:2008 | 11 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,897 | $1,517 | Not Implemented |
OK0768 # 12 Y:2008 | 12 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,034 | $129,640 | Implemented |
OK0768 # 13 Y:2008 | 13 | 2008 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $25,952 | $64,800 | Implemented |
OK0768 # 14 Y:2008 | 14 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,760 | $7,525 | Implemented |
OK0768 # 15 Y:2008 | 15 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $131,460 | $41,080 | Implemented |
OK0768 # 16 Y:2008 | 16 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,790 | $36,060 | Not Implemented |
OK0768 # 17 Y:2008 | 17 | 2008 | TREAT AND REUSE RINSE WATERS | $139,194 | $135,000 | Not Implemented |
OK0768 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $208 | $1,615 | Not Implemented |
OK0768 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,704 | $17,980 | Implemented |
OK0768 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,022 | $4,452 | Not Implemented |
OK0768 # 01 Y:2008 | 01 | 2008 | USE PHOTOCELL CONTROLS | $959 | $398 | Not Implemented |
OK0768 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $441 | $2,703 | Not Implemented |
MS0331 # 02 Y:2008 | 02 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $81,985 | $18,000 | Not Implemented |
MS0331 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $91,249 | $79,567 | Not Implemented |