Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,214
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0432 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,546 | $29,394 | n/a |
MS0432 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $399 | $4,320 | n/a |
MS0432 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,097 | $340,025 | n/a |
TT0300 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $41,095 | $32,000 | n/a |
TT0300 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $22,385 | $37,500 | n/a |
TT0300 # 11 Y:2023 | 11 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,965 | n/a |
TT0300 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,049 | $13,500 | n/a |
TT0300 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,809 | $156 | n/a |
TT0300 # 10 Y:2023 | 10 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,509 | $17,500 | n/a |
TT0300 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,078 | $18,500 | n/a |
TT0300 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,075 | $30,000 | n/a |
TT0300 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,614 | $19,910 | n/a |
TT0300 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,281 | $13,000 | n/a |
TT0300 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,047 | $221,715 | n/a |
SU0520 # 05 Y:2022 | 05 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,727 | $4,920 | Not Implemented |
SU0520 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,573 | $5,527 | Not Implemented |
SU0520 # 06 Y:2022 | 06 | 2022 | REDUCE VENTILATION AIR | $557 | $882 | Not Implemented |
SU0520 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,448 | $758 | Not Implemented |
SU0520 # 01 Y:2022 | 01 | 2022 | USE SYNTHETIC LUBRICANT | $540 | $0 | Not Implemented |
SU0520 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $173 | $831 | Not Implemented |
SU0520 # 03 Y:2022 | 03 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $147,518 | $63,000 | Not Implemented |
OK1062 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,294 | $2,732 | Implemented |
OK1062 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $101 | $580 | Implemented |
OK1062 # 03 Y:2022 | 03 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $12,930 | $48,590 | Not Implemented |
OK1062 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,957 | $30,186 | Implemented |