IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,214

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0357 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,523 $1,359 Implemented
UM0357 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $1,466 $4,692 Implemented
UM0357 # 07 Y:2009 07 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,875 $7,500 Implemented
BD0354 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,388 $80,292 Not Implemented
BD0354 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $767 $1,100 Not Implemented
BD0354 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $685 $1,816 Not Implemented
BD0354 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,005 $0 Not Implemented
BD0354 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,270 $1,500 Not Implemented
BD0354 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,132 $3,100 Not Implemented
BD0354 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $13,322 $2,000 Not Implemented
BD0354 # 08 Y:2009 08 2009 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $24,415 $0 Not Implemented
OK0761 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,213 $0 Implemented
OK0761 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $14,263 $4,638 Implemented
OK0761 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $525 $2,871 Implemented
OK0761 # 04 Y:2008 04 2008 INSTALL SET-BACK TIMERS $3,105 $1,908 Implemented
OK0761 # 05 Y:2008 05 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,200 $0 Implemented
SU0255 # 01 Y:2007 01 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,744 $0 Implemented
SU0255 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,004 $0 Implemented
SU0255 # 03 Y:2007 03 2007 PAY BILLS ON TIME TO AVOID LATE FEES $765 $0 Implemented
SU0255 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $336 $0 Not Implemented
SU0255 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,293 $1,300 Implemented
SU0255 # 06 Y:2007 06 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,489 $4,993 Not Implemented
SU0255 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $237 Not Implemented
SU0255 # 08 Y:2007 08 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $14,202 $19,571 Not Implemented
SU0255 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,084 $5,590 Not Implemented