Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2010
Principal Product ASME Pressure Vessels
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 38
Plant Area (Sq.Ft.) 40,000
Annual Production 100 Pieces
Production Hrs. Annual 3,744
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,346 612,400 kWh $0.07
Electricity Demand $7,187 1,240 kW-months/year $5.80
Electricity Fees $10,251 - $ -
Natural Gas $24,359 2,437 MMBtu $10.00
TOTAL ENERGY COSTS $86,143
RECOMMENDED SAVINGS* $33,091 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,405
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$7,334
Cost:
$3,180
- - - - $7,334 733 - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,334
733
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,652
Cost:
$16,478
$3,247 47,133 $874 151 - - - - $106 - - - $425 - $3,247
47,133
kWh
$874
151
kW-months/year
-
-
MMBtu
-
-
gal
$106
-
$
-
-
$
$425
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,271
Cost:
$900
$2,576 37,385 $695 120 - - - - - - - - - - $2,576
37,385
kWh
$695
120
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$1,922
Cost:
$2,547
$1,922 27,900 - - - - - - - - - - - - $1,922
27,900
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,134
Cost:
$750
$1,090 12,600 $44 24 - - - - - - - - - - $1,090
12,600
kWh
$44
24
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$907
Cost:
$104
$715 10,389 $192 33 - - - - - - - - - - $715
10,389
kWh
$192
33
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$556
Cost:
$15
$438 6,368 $118 20 - - - - - - - - - - $438
6,368
kWh
$118
20
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$277
Cost:
$700
$204 2,964 $73 13 - - - - - - - - - - $204
2,964
kWh
$73
13
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$250
$183 2,663 $21 4 - - - - - - - - - - $183
2,663
kWh
$21
4
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$12,834
Cost:
$3,400
- - - - - - $1,369 - - - $11,465 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,369
-
gal
-
-
$
$11,465
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$33,091
Cost:
$28,324
$10,375 147,402 $2,017 365 $7,334 733 $1,369 - $106 - $11,465 - $425 - $10,375
147,402
kWh
$2,017
365
kW-months/year
$7,334
733
MMBtu
$1,369
-
gal
$106
-
$
$11,465
-
$
$425
-
$
TOTAL IMPLEMENTED Savings:
$4,405
Cost:
$1,650
$3,666 49,985 $739 144 - - - - - - - - - - $3,666
49,985
kWh
$739
144
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost