IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,214

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0243 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,122 $440 Implemented
LL0243 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $932 $372 Implemented
LL0243 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $538 $270 Implemented
LL0243 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $527 $30 Implemented
LL0243 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $509 $350 Implemented
LL0243 # 08 Y:2006 08 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $135 $198 Not Implemented
AM0506 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $10,035 $10,765 Implemented
AM0506 # 02 Y:2006 02 2006 INSTALL SKYLIGHTS $8,850 $20,715 Not Implemented
AM0506 # 03 Y:2006 03 2006 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,660 $220 Not Implemented
AM0506 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,555 $8,630 Implemented
AM0506 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,260 $25 Implemented
AM0506 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $250 Implemented
AM0506 # 07 Y:2006 07 2006 REUSE RAGS UNTIL COMPLETELY SOILED $600 $0 Not Implemented
UM0266 # 01 Y:2004 01 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,825 $4,500 Implemented
UM0266 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,131 $7,512 Implemented
UM0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $900 Implemented
UM0266 # 04 Y:2004 04 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,182 $1,000 Not Implemented
UM0266 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,847 $2,000 Implemented
UM0266 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,400 $700 Not Implemented
UM0266 # 07 Y:2004 07 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,312 $3,500 Not Implemented
UM0266 # 08 Y:2004 08 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $1,614 $500 Implemented
UM0266 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,195 $603 Not Implemented
UM0266 # 10 Y:2004 10 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $666 $610 Implemented
WI0473 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,462 $53,600 Implemented
WI0473 # 02 Y:2004 02 2004 REDUCE VENTILATION AIR $16,661 $32,000 Not Implemented