Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0306 # 01 Y:1990 | 01 | 1990 | OPTIMIZE PLANT POWER FACTOR | $3,681 | $6,000 | Not Implemented |
UD0306 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,064 | $4,000 | Not Implemented |
UD0306 # 04 Y:1990 | 04 | 1990 | INSTALL SET-BACK TIMERS | $3,650 | $0 | Not Implemented |
UD0306 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,668 | $100 | Not Implemented |
UD0306 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,994 | $3,000 | Not Implemented |
UD0264 # 04 Y:1988 | 04 | 1988 | INSTALL STORM WINDOWS AND DOORS | $984 | $929 | Implemented |
UD0264 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,732 | $3,790 | Implemented |
UD0264 # 02 Y:1988 | 02 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $880 | $1,200 | Not Implemented |
UD0264 # 01 Y:1988 | 01 | 1988 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $677 | $0 | Implemented |
UD0224 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,509 | $6,000 | Not Implemented |
UD0224 # 01 Y:1987 | 01 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,584 | $0 | Not Implemented |
UD0224 # 02 Y:1987 | 02 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,048 | $7,200 | Not Implemented |
UD0224 # 04 Y:1987 | 04 | 1987 | REDUCE GLAZED AREAS IN BUILDINGS | $3,429 | $5,800 | Not Implemented |
UD0224 # 05 Y:1987 | 05 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,313 | $2,500 | Implemented |
UD0182 # 07 Y:1985 | 07 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,516 | $2,500 | Implemented |
UD0182 # 01 Y:1985 | 01 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $153,020 | $24,416 | Implemented |
UD0182 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,436 | $0 | Implemented |
UD0182 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $8,435 | $1,100 | Implemented |
UD0182 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,277 | $50,700 | Not Implemented |
UD0182 # 05 Y:1985 | 05 | 1985 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $2,860 | $1,300 | Not Implemented |
UD0182 # 06 Y:1985 | 06 | 1985 | MINIMIZE WATER USAGE | $38,577 | $4,000 | Implemented |
UD0175 # 01 Y:1985 | 01 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $25,286 | $48,000 | Implemented |
UD0172 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,195 | $123 | Implemented |
UD0172 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $546 | $0 | Implemented |
UD0172 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,225 | $50 | Implemented |