IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,211

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0081 # 02 Y:1990 02 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,627 $8,575 Implemented
AM0081 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,400 $1,000 Implemented
AM0081 # 04 Y:1990 04 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,350 $0 Implemented
AM0081 # 05 Y:1990 05 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $545 $2,000 Not Implemented
AM0081 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $1,640 Implemented
UD0306 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $3,681 $6,000 Not Implemented
UD0306 # 02 Y:1990 02 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,994 $3,000 Not Implemented
UD0306 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,064 $4,000 Not Implemented
UD0306 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $3,650 $0 Not Implemented
UD0306 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,668 $100 Not Implemented
WI0062 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $12,224 $0 Not Implemented
WI0062 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $4,059 $3,500 Implemented
WI0062 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $709 $2,290 Implemented
WI0062 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,647 $0 Not Implemented
WI0062 # 05 Y:1989 05 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,596 $6,000 Implemented
WI0062 # 06 Y:1989 06 1989 IMPROVE LUBRICATION PRACTICES $1,320 $0 Not Implemented
WI0062 # 07 Y:1989 07 1989 INSTALL STORM WINDOWS AND DOORS $959 $2,090 Not Implemented
AM0047 # 01 Y:1989 01 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,876 $0 Not Implemented
AM0047 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,301 $1,500 Implemented
AM0047 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $578 Not Implemented
UD0264 # 01 Y:1988 01 1988 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $677 $0 Implemented
UD0264 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $880 $1,200 Not Implemented
UD0264 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,732 $3,790 Implemented
UD0264 # 04 Y:1988 04 1988 INSTALL STORM WINDOWS AND DOORS $984 $929 Implemented
WI0032 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $31,106 $0 Not Implemented