Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,219
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0084 # 01 Y:1990 | 01 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,755 | $1,000 | Implemented |
AM0084 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,615 | $2,600 | Implemented |
AM0084 # 03 Y:1990 | 03 | 1990 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,370 | $7,060 | Implemented |
AM0084 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $282 | $606 | Implemented |
AM0084 # 05 Y:1990 | 05 | 1990 | INSTALL SET-BACK TIMERS | $270 | $0 | Implemented |
AM0084 # 06 Y:1990 | 06 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $105 | $0 | Implemented |
AM0084 # 07 Y:1990 | 07 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $90 | $0 | Implemented |
AM0081 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,096 | $36,735 | Implemented |
AM0081 # 02 Y:1990 | 02 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,627 | $8,575 | Implemented |
AM0081 # 03 Y:1990 | 03 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,400 | $1,000 | Implemented |
AM0081 # 04 Y:1990 | 04 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,350 | $0 | Implemented |
AM0081 # 05 Y:1990 | 05 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $545 | $2,000 | Not Implemented |
AM0081 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $1,640 | Implemented |
UD0306 # 01 Y:1990 | 01 | 1990 | OPTIMIZE PLANT POWER FACTOR | $3,681 | $6,000 | Not Implemented |
UD0306 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,994 | $3,000 | Not Implemented |
UD0306 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,064 | $4,000 | Not Implemented |
UD0306 # 04 Y:1990 | 04 | 1990 | INSTALL SET-BACK TIMERS | $3,650 | $0 | Not Implemented |
UD0306 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,668 | $100 | Not Implemented |
WI0062 # 01 Y:1989 | 01 | 1989 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $12,224 | $0 | Not Implemented |
WI0062 # 02 Y:1989 | 02 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $4,059 | $3,500 | Implemented |
WI0062 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $709 | $2,290 | Implemented |
WI0062 # 04 Y:1989 | 04 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,647 | $0 | Not Implemented |
WI0062 # 05 Y:1989 | 05 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,596 | $6,000 | Implemented |
WI0062 # 06 Y:1989 | 06 | 1989 | IMPROVE LUBRICATION PRACTICES | $1,320 | $0 | Not Implemented |
WI0062 # 07 Y:1989 | 07 | 1989 | INSTALL STORM WINDOWS AND DOORS | $959 | $2,090 | Not Implemented |