Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,214
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0048 # 02 Y:1982 | 02 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,904 | $2,500 | Not Implemented |
UD0048 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $815 | $600 | Not Implemented |
UD0048 # 04 Y:1982 | 04 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,992 | $1,000 | Not Implemented |
OK0047 # 01 Y:1982 | 01 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,188 | $7,040 | Not Implemented |
OK0047 # 02 Y:1982 | 02 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,056 | $372 | Not Implemented |
OK0047 # 03 Y:1982 | 03 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $417 | $300 | Not Implemented |
OK0047 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $903 | $462 | Not Implemented |
OK0047 # 05 Y:1982 | 05 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,082 | $28,910 | Not Implemented |
OK0045 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150 | $147 | Not Implemented |
OK0045 # 04 Y:1982 | 04 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $67 | $200 | Not Implemented |
OK0045 # 05 Y:1982 | 05 | 1982 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $519 | $1,434 | Not Implemented |
OK0045 # 06 Y:1982 | 06 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $489 | $345 | Not Implemented |
OK0045 # 07 Y:1982 | 07 | 1982 | OPTIMIZE PLANT POWER FACTOR | $1,161 | $1,260 | Not Implemented |
TN0122 # 01 Y:1982 | 01 | 1982 | USE OPTIMUM TEMPERATURE | $1,593 | $0 | Not Implemented |
TN0122 # 02 Y:1982 | 02 | 1982 | COVER OPEN TANKS | $467 | $900 | Not Implemented |
TN0122 # 03 Y:1982 | 03 | 1982 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $663 | $800 | Not Implemented |
TN0122 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $481 | $82 | Not Implemented |
OK0034 # 01 Y:1982 | 01 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,616 | $135 | Not Implemented |
OK0034 # 02 Y:1982 | 02 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $501 | $121 | Not Implemented |
OK0034 # 03 Y:1982 | 03 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $44,316 | $156,240 | Not Implemented |
OK0034 # 04 Y:1982 | 04 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $275 | $80 | Not Implemented |
OK0034 # 05 Y:1982 | 05 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $656 | $560 | Not Implemented |
OK0034 # 06 Y:1982 | 06 | 1982 | OPTIMIZE PLANT POWER FACTOR | $2,335 | $6,560 | Not Implemented |
OK0022 # 01 Y:1982 | 01 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,321 | $24,185 | Not Implemented |
OK0022 # 02 Y:1982 | 02 | 1982 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,332 | $15,000 | Not Implemented |