IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,214

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0489 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,208 $8,000 Not Implemented
LE0489 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,609 $10,500 Not Implemented
LE0489 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,293 $12,000 Not Implemented
LE0489 # 01 Y:2020 01 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $3,081 $48 Not Implemented
LS1913 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $65 $193 Not Implemented
LS1913 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,611 $8,430 Not Implemented
LS1913 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $989 $225 Not Implemented
LS1913 # 03 Y:2019 03 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,051 $270 Not Implemented
LS1913 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $25 Not Implemented
LS1913 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,175 $50 Not Implemented
MZ0282 # 05 Y:2019 05 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $287,984 $1,030,500 Not Implemented
MZ0282 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,849 $320 Not Implemented
MZ0282 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,896 $2,300 Not Implemented
MZ0282 # 02 Y:2019 02 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,947 $24,000 Not Implemented
MZ0282 # 01 Y:2019 01 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $586 $472 Implemented
MZ0282 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $7,721 $7,200 Implemented
MZ0282 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $53,310 $16,200 Implemented
MZ0282 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,909 $680 Implemented
MZ0282 # 10 Y:2019 10 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,466 $2,964 Not Implemented
MZ0282 # 11 Y:2019 11 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,699 $18,720 Not Implemented
MZ0282 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,100 $14,000 Not Implemented
NL0033 # 01 Y:2019 01 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $39,609 $71,240 Implemented
NL0033 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,635 $42,417 Not Implemented
NL0033 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $919 $1,000 Implemented
NL0033 # 04 Y:2019 04 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $539 $100 Not Implemented