IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0520 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,727 $4,920 Not Implemented
SU0520 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,573 $5,527 Not Implemented
SU0520 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $173 $831 Not Implemented
SU0520 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $557 $882 Not Implemented
SU0520 # 03 Y:2022 03 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $147,518 $63,000 Not Implemented
SU0520 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,448 $758 Not Implemented
SU0520 # 01 Y:2022 01 2022 USE SYNTHETIC LUBRICANT $540 $0 Not Implemented
SU0255 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,293 $1,300 Implemented
SU0255 # 12 Y:2007 12 2007 OPTIMIZE PLANT POWER FACTOR $563 $3,344 Not Implemented
SU0255 # 11 Y:2007 11 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $269 $727 Not Implemented
SU0255 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,025 $32,224 Not Implemented
SU0255 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,084 $5,590 Not Implemented
SU0255 # 08 Y:2007 08 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $14,202 $19,571 Not Implemented
SU0255 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $237 Not Implemented
SU0255 # 06 Y:2007 06 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,489 $4,993 Not Implemented
SU0255 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $336 $0 Not Implemented
SU0255 # 03 Y:2007 03 2007 $765 $0 Implemented
SU0255 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,004 $0 Implemented
SU0255 # 01 Y:2007 01 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,744 $0 Implemented
HO0114 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $414 $200 Implemented
HO0114 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $143 $200 Implemented
HO0114 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $763 Implemented
HO0114 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $296 Implemented
HO0031 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,820 $8,205 Not Implemented
HO0031 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $194 $193 Not Implemented